Retaining wall materials checklist for Pakenham homes

A retaining wall needs more than sleepers and posts, and a missing item stops the job for a day. This checklist lists the 6 groups of materials, shows how to work out sleeper numbers and says what to check when the truck arrives.

Quick answer

Every wall needs the wall material, posts or footings, concrete, drainage pipe and stone, filter cloth and backfill. Work out sleeper numbers from length and height, order a small extra allowance, and check each delivery against the quote. Decide in writing who orders what.

Stack of sleepers, bags of drainage stone and a roll of drain pipe delivered to a suburban driveway
Illustrative image of delivered wall materials, not a photo of a real job.

What materials does a retaining wall need?

  1. Wall material. Treated pine or hardwood sleepers, concrete sleepers or blocks. Our treated pine guide explains the H4 and H5 ratings for timber.
  2. Posts or a footing. Steel or timber posts, or a concrete strip footing for a block wall.
  3. Concrete. For post holes and footings, in the quantity the design calls for.
  4. Drain pipe. Slotted pipe laid along the base behind the wall, with a place for the water to leave.
  5. Drainage stone and filter cloth. Clean stone against the back of the wall, wrapped in cloth so soil does not clog it.
  6. Backfill. Soil to build levels, kept separate from the drainage stone.

The drainage items are the ones people leave off a budget. They are also the ones that decide whether the wall lasts. See our drainage page for the layers in order.

How do I work out how many sleepers I need?

Use two numbers: the rows up the wall and the sleepers along each row. Sleepers are commonly sold about 200 mm high, so each row adds 200 mm of wall.

Wall height above groundRows of 200 mm sleepers
0.6 m3 rows
0.8 m4 rows
1.2 m6 rows

Then divide the wall length by the sleeper length. A 12 metre wall in 2.4 metre sleepers needs 5 sleepers per row. At 4 rows that is 20 sleepers, before the buried part and a small allowance for offcuts. Your builder will adjust these numbers to the design, so use them to sanity check a quote, not to order.

Want your numbers checked?

Send us the length, height and wall type. We will tell you what a quote for your wall should list so you can compare any price on the same basis.

Check my numbers ☎ Ring (03) 9022 6418

Why does the height change everything?

Once a wall is more than 1 metre high, a building permit is needed in Victoria, and the design usually comes from an engineer. Posts get deeper, footings get wider, and the materials list changes with them. Read our Cardinia Shire permits page before you order anything for a tall wall.

What should I check when the delivery arrives?

  • The docket matches the quote for size, length and quantity.
  • Timber carries its hazard class mark, and concrete sleepers are free of large cracks.
  • Drainage stone is clean and not mixed with fines or soil.
  • The drain pipe is slotted and the filter cloth is in the roll size you ordered.
  • Everything is stacked off the ground and clear of the wall line.

If the load is short or wrong, photograph it and tell the supplier the same day. Waiting until the crew is on site turns a phone call into a lost day.

Who should order the materials?

The answer sets who carries the risk if something is wrong. There are two common set-ups.

Set-upWhat to confirm
Builder suppliesThe quote lists each item
You supplyThe builder approves the list first

Either way, write down the specification, the delivery day and who is on site to receive it. For a longer look at the choice, see our guide on DIY versus professional walls and how to compare retaining wall quotes.

Does access change what I can order?

Yes. Long sleepers and bulk stone need a clear path. If the only route to the yard is a narrow side gate, ask for shorter lengths or bagged stone. Our narrow access guide covers the build side. The digging side is covered in the excavator hire guide.

We work across Pakenham, Officer, Beaconsfield and the wider Cardinia Shire, and the concrete sleeper wall and block wall service pages show the materials for each type.

Slotted drain pipe wrapped in filter cloth laid along the base of a new retaining wall with clean stone beside it
Illustrative image of drainage materials at the base of a wall, not a photo of a real job.

What happens when you enquire?

  1. Send a sketch with the run of the wall, how tall it will be and the material you are leaning towards.
  2. We visit, measure and note access for deliveries.
  3. You receive a written quote with the materials and drainage itemised. See the pricing page for how quotes are built.

Materials questions

Should I buy the retaining wall materials myself or let the builder supply them?

Both work if the quote says clearly who orders what. A builder who supplies materials takes on the ordering, the delivery and any shortfall. If you buy them yourself, get the specification in writing first so the sleepers, posts and drainage match the design.

How many sleepers do I need for my wall?

Divide the wall length by the sleeper length for the number in one row, then multiply by the rows needed for the height. Sleepers are commonly sold about 200 mm high and in 2.4 metre lengths, but check what your supplier stocks. Add the part buried below ground and a small allowance for cut-offs.

What else does a retaining wall need besides sleepers and posts?

Concrete for the footings, drainage pipe, clean drainage stone, filter cloth, and backfill. The drainage parts are not optional on a wall that holds back soil. Fixings and caps depend on the wall type.

Can delivery access be a problem on a Pakenham estate block?

It can. Long sleepers and bulk stone arrive on large trucks, and a narrow side path or a steep driveway changes how they are unloaded. Tell the supplier the access before you book a delivery. Our narrow access guide covers the wall side.

Does a retaining wall need an engineer or a permit even if I buy the materials?

Buying materials does not change the approval rules. A wall more than 1 metre high in Victoria needs a building permit, and a lower wall can need one if it protects a neighbouring property. Confirm with a registered building surveyor before you order.

Ready for a list you can compare?

We itemise the materials in every written quote, so you can see what each line covers and what is left out.